Phase 1 Numbered Areas (1)
Step 1 Design Elements (3)
| Add Capacity |
| Site Grading |
| Road Raise |
| Weir |
Step 1 Pipe (4)
Step 1 Road Raise and Berms (5)
| Ryan Rd Raise |
| Berms |
Step 2 Design Elements (7)
| Block Flow |
| New Pipe |
Step 2 Pipe (8)
Step 3 Design Elements (10)
| Site Grading |
| New Pipe |
Step 3 Pipe (11)
Step 3 Site Grading (12)
Redirect Runoff (13)
Step 4 Design Elements (15)
| Add Capacity |
| Restore Ditch Capacity |
Step 4 Line Designs (16)
| Pipe |
| Restore Ditch Capacity |
Phase 1: Mask (17)
Phase 1: Major Subwatersheds (18)
Phase 2 Numbered Areas (20)
Step 1 Design Elements (22)
| Add Capacity |
Step 1 Pipe (23)
Step 2 Design Elements (25)
| Add Capacity |
Step 2 Pipe (26)
Step 3 Design Elements (28)
| Add Capacity |
| Site Grading |
| Weir |
| Restore Ditch Capacity |
Step 3 Line Designs (29)
| Site Grading |
| Restore Ditch Capacity |
| Pipe |
Phase 2: Major Subwatersheds (30)
Phase 2: Mask (31)
Phase 3 Numbered Areas (33)
WC1 Design Elements (35)
| Add Capacity |
WC1 Pipe (36)
WC2 Design Elements (38)
| Outlet Modification |
| Site Grading |
WC2 Site Grading (39)
KC1 Design Elements (41)
| Add Capacity |
| New Pipe |
| Back Flow Preventor |
KC1 Flood Proofing (42)
KC1 Pipe (43)
KC1 Surface / Underground Storage (44)
KC1 Redirect Runoff (45)
KC2 Design Elements (47)
| Back Flow Preventor |
| New Pipe |
| Road Raise |
KC2 Pipe (48)
KC2 Road Raise (49)
KC2 Green Infrastructure (50)
KC2 Redirect Runoff (51)
KC3 Design Elements (53)
| New Pipe |
| Weir |
KC3 Pipe (54)
KC4 Design Elements (56)
| Add Capacity |
| Site Grading |
| New Pipe |
| Weir |
| Outlet Modification |
KC4 Flood Proofing (57)
KC4 Pipe (58)
KC4 Site Grading (59)
KC4 Pond Expansion (60)
KC4 Surface / Underground Storage (61)
KC4 Green Infrastructure (62)
KC5 Design Elements (64)
| Outlet Modification |
| Site Grading |
| New Pipe |
KC5 Pipe (65)
KC5 Site Grading (66)
Phase 3: Mask (67)
Phase 3: Major Subwatersheds (68)
Phase 4 Numbered Areas (70)
System Design Elements (72)
| Site Grading |
| Outlet Modification |
System Proposed Site Grading (73)
| Site Grading |
2 L Design Elements (75)
| Add Capacity |
2 L Pipe (76)
3 L Design Elements (78)
| Add Capacity |
3 L Pipe (79)
4 L Design Elements (81)
| Site Grading |
| Modification |
| New Pipe |
4 L Pipe (82)
4 L Site Grading (83)
4 L Detention Pond (84)
4 L Surface / Underground Storage (85)
4 L Redirect Runoff (86)
5 L Design Elements (88)
| Add Capacity |
| Site Grading |
| New Pipe |
| Modification |
| Road Raise |
5 L Site Grading (89)
| Site Grading |
| Road Raise |
5 L Pipe (90)
5 L Detention Pond (91)
5 L Surface / Underground Storage (92)
5 L Additional Inlet Capacity (93)
6 L Design Elements (95)
| Add Capacity |
| Site Grading |
| New Pipe |
6 L Pipe (96)
6 L Site Grading (97)
6 L Above Ground Storage (98)
6 L Redirect Runoff (99)
Phase 4: Major Subwatersheds (100)
Phase 4: Mask (101)
District Managed Lakes (102)
District Managed Streams (103)
Storm Sewer Pipe (104)
| Storm Sewer Pipe |
|