ArcGIS REST Services Directory Login
JSON

Legend (RWMWD/RWMWD_BeltlineResiliency_AllPhases_DesignElements_MS)

Phase 1 Numbered Areas (1)
Step 1 Design Elements (3)
Add Capacity Add Capacity
Site Grading Site Grading
Road Raise Road Raise
Weir Weir
Step 1 Pipe (4)
Step 1 Road Raise and Berms (5)
Ryan Rd Raise Ryan Rd Raise
Berms Berms
Step 2 Design Elements (7)
Block Flow Block Flow
New Pipe New Pipe
Step 2 Pipe (8)
Step 3 Design Elements (10)
Site Grading Site Grading
New Pipe New Pipe
Step 3 Pipe (11)
Step 3 Site Grading (12)
Redirect Runoff (13)
Step 4 Design Elements (15)
Add Capacity Add Capacity
Restore Ditch Capacity Restore Ditch Capacity
Step 4 Line Designs (16)
Pipe Pipe
Restore Ditch Capacity Restore Ditch Capacity
Phase 1: Mask (17)
Phase 1: Major Subwatersheds (18)
Phase 2 Numbered Areas (20)
Step 1 Design Elements (22)
Add Capacity Add Capacity
Step 1 Pipe (23)
Step 2 Design Elements (25)
Add Capacity Add Capacity
Step 2 Pipe (26)
Step 3 Design Elements (28)
Add Capacity Add Capacity
Site Grading Site Grading
Weir Weir
Restore Ditch Capacity Restore Ditch Capacity
Step 3 Line Designs (29)
Site Grading Site Grading
Restore Ditch Capacity Restore Ditch Capacity
Pipe Pipe
Phase 2: Major Subwatersheds (30)
Phase 2: Mask (31)
Phase 3 Numbered Areas (33)
WC1 Design Elements (35)
Add Capacity Add Capacity
WC1 Pipe (36)
WC2 Design Elements (38)
Outlet Modification Outlet Modification
Site Grading Site Grading
WC2 Site Grading (39)
KC1 Design Elements (41)
Add Capacity Add Capacity
New Pipe New Pipe
Back Flow Preventor Back Flow Preventor
KC1 Flood Proofing (42)
KC1 Pipe (43)
KC1 Surface / Underground Storage (44)
KC1 Redirect Runoff (45)
KC2 Design Elements (47)
Back Flow Preventor Back Flow Preventor
New Pipe New Pipe
Road Raise Road Raise
KC2 Pipe (48)
KC2 Road Raise (49)
KC2 Green Infrastructure (50)
KC2 Redirect Runoff (51)
KC3 Design Elements (53)
New Pipe New Pipe
Weir Weir
KC3 Pipe (54)
KC4 Design Elements (56)
Add Capacity Add Capacity
Site Grading Site Grading
New Pipe New Pipe
Weir Weir
Outlet Modification Outlet Modification
KC4 Flood Proofing (57)
KC4 Pipe (58)
KC4 Site Grading (59)
KC4 Pond Expansion (60)
KC4 Surface / Underground Storage (61)
KC4 Green Infrastructure (62)
KC5 Design Elements (64)
Outlet Modification Outlet Modification
Site Grading Site Grading
New Pipe New Pipe
KC5 Pipe (65)
KC5 Site Grading (66)
Phase 3: Mask (67)
Phase 3: Major Subwatersheds (68)
Phase 4 Numbered Areas (70)
System Design Elements (72)
Site Grading Site Grading
Outlet Modification Outlet Modification
System Proposed Site Grading (73)
Site Grading Site Grading
2 L Design Elements (75)
Add Capacity Add Capacity
2 L Pipe (76)
3 L Design Elements (78)
Add Capacity Add Capacity
3 L Pipe (79)
4 L Design Elements (81)
Site Grading Site Grading
Modification Modification
New Pipe New Pipe
4 L Pipe (82)
4 L Site Grading (83)
4 L Detention Pond (84)
4 L Surface / Underground Storage (85)
4 L Redirect Runoff (86)
5 L Design Elements (88)
Add Capacity Add Capacity
Site Grading Site Grading
New Pipe New Pipe
Modification Modification
Road Raise Road Raise
5 L Site Grading (89)
Site Grading Site Grading
Road Raise Road Raise
5 L Pipe (90)
5 L Detention Pond (91)
5 L Surface / Underground Storage (92)
5 L Additional Inlet Capacity (93)
6 L Design Elements (95)
Add Capacity Add Capacity
Site Grading Site Grading
New Pipe New Pipe
6 L Pipe (96)
6 L Site Grading (97)
6 L Above Ground Storage (98)
6 L Redirect Runoff (99)
Phase 4: Major Subwatersheds (100)
Phase 4: Mask (101)
District Managed Lakes (102)
District Managed Streams (103)
Storm Sewer Pipe (104)
Storm Sewer Pipe Storm Sewer Pipe